Welcome!

Wearables Authors: Yeshim Deniz, Pat Romanski, Scott Allen, Kevin Benedict, Elizabeth White

News Feed Item

Pure Gold Announces 2014 Drill Program at the Madsen Gold Project

9,000 Metre Drill Program Planned for Resource Expansion and Target Generation

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 08/07/14 -- Pure Gold Mining Inc. (TSX VENTURE: PGM) ("Pure Gold" or the "Company") is pleased to announce the launch of a 9,000 metre drill program directed at key exploration targets at its 100% owned Madsen Gold Project in the prolific Red Lake gold district of northwest Ontario. The program is expected to commence in mid-August, and is designed to test and expand the current mineral resource, while concurrently testing high-grade, 8 Zone-style mineralization targets developed through ongoing consolidation and evaluation of the large historic database.

"We are excited to launch our 2014 drill program as we begin to test targets developed through our 'proof of concept' exploration model," stated Darin Labrenz, President & CEO of Pure Gold. "Initial drilling is designed to increase the mineral resource and will test near surface targets along the 12-km Madsen Trend. Drilling will expand to test highly prospective targets generated from early exploration activity with a goal of discovering new zones of high-grade mineralization along the 10 km-long ultramafic contact."

Pure Gold's $4.0 million program combines 9,000 metres of exploration drilling, a geological Footprint Modelling program, a 1,643 line-kilometre helicopter-borne geophysics survey, structural mapping, and a robust geochemical soil and rock sampling program designed to expand and delineate targets along the 12 km-long Madsen unconformity and the 10 km-long ultramafic contact within the Madsen property.

The program will be focused on near-surface step out drilling around the high-grade mineralization in the Madsen Mine Trend, as well as exploration drilling at the McVeigh Ramp, Fork Zone, Junction, Point and other high priority targets across the property. Pure Gold drilling will occur on patented mineral claims easily accessed from the extensive infrastructure network.

DETAILS OF THE TARGETS TO BE DRILL TESTED:

McVeigh Ramp Target:

The McVeigh Zone is a zone of highly strained, moderately to strongly silicified and biotite altered pillow basalts and minor sulphidic sediments, located approximately 750 metres southwest of the Madsen shaft. Typically gold occurs within three stacked lenses of silicified and altered basalt with two to five percent pyrite and lesser pyrrhotite. The McVeigh Ramp has been historically explored and developed in the top two levels of the mine, but potential exists to significantly expand the resource to depth. Pure Gold will target mineralization on the southern edge of the McVeigh Ramp, below the 2nd level with the goal of improving the confidence of, and expanding the mineral resource. Historic drilling in this area has returned 5.6 metres grading 26.4 g/t gold approximately 150 metres below surface from drill hole 4M-224, and 2.9 metres grading 9.0 g/t gold from hole 2M-349 located approximately 100 metres below surface.(1)

Fork Zone Target:

The Fork Zone target is located approximately 1,300 metres south of the Madsen shaft, and approximately 500 metres south of and along strike of the McVeigh Ramp Target. The Fork Zone was initially discovered in 2003 when drilling targeted and intersected a highly altered and deformed basalt and ultramafic contact which suggested the presence of a folded ultramafic nose. Mineralization in the Fork Zone has been interpreted by past operators to form a shallow, open, southeast plunge, and occurs as both replacement style and vein-hosted mineralization associated with the hanging wall contact of the mafic-ultramafic rock units.

Recent re-logging of Fork Zone drill holes and interpretation by Pure Gold suggests that at least two mineralization trends are defined within the Fork Zone, with a shallow flat-lying mineralized horizon intersected by a potentially higher-angle, structurally controlled high-grade vein system. Previous shallow drilling in the Fork Zone has returned 17.3 g/t gold over 10.3 metres from RUM-08-49 and 6.7 metres grading 13.4 g/t gold from hole RUM-08-52, with recent re-sampling of RUM-08-52 returning 5.8 metres grading 21.5 g/t gold(2) (see Table 1). Potential exists at the Fork Zone to define a high-grade mineralized system analogous to 8 Zone mineralization along the mafic - ultramafic contact.

Pure Gold drilling will target both low angle and high angle mineralization in the Fork Zone utilizing oriented core in order to test prospective horizons, and better define structural control on high-grade mineralization with the goal of potentially defining a new mineral resource for the target area.

Junction Target:

The Junction target is located approximately 1,800 metres south of the Madsen shaft, and approximately 500 metres east of the Fork Zone target. The target lies on strike of and is interpreted to be the southern extension of the historic Austin Zone. The target has been intersected by drill hole ST-10-33 which returned intense alteration in the interpreted extension of the Austin Zone, and returned 7.0 g/t gold over 2.0 metres.(2)

Recent mapping by Pure Gold on the property has focused on the unconformity contact between the Balmer Assemblage mafic volcanics, gabbro and ultramafic rocks, and the overlying Confederation Assemblage felsic volcanic rocks, with the objective of mapping in detail the rock types, alteration, geologic contacts and to explain why mineralization is focused in particular zones along the important contact. Mineralization along the unconformity coincides with increased width of biotite-garnet alteration, often in sinistral steps or jogs along the structure.

The Junction target is characterized by both a flexure in the unconformity and by increased widths of recently mapped biotite-garnet alteration. Pure Gold will target the area with drilling designed to intersect the unconformity and the altered zone on the Balmer Assemblage side of the contact. The target has historically been poorly explored, and provides an opportunity to define and extend Austin Zone mineralization one kilometer south of the Madsen Mine development.

Point Target:

The Point Target is located approximately 1,300 metres northeast of the Madsen Shaft. The target area was mined historically from the 10 level and lower, and is characterized by a westerly displacement in the Austin Zone. Recent surface mapping in the area has identified a thickened zone of biotite-garnet alteration associated with a sinistral jog in the unconformity which corresponds with historic mining of the Austin Zone to depth.

Pure Gold will target the prospective, near surface alteration associated with structural deformation with the goal of identifying mineralization similar to the Austin Zone mined at depth below 10 level.

Russet South Target - 8 Zone Up Dip:

The Russet South Target is located approximately 1,400 metres west of the Madsen Shaft, and approximately 1,600 metres up-dip of the 8 Zone resource. The target lies on the western flank of the Russet ultramafic contact and was explored historically prior to consolidation of the property. The target area exhibits strong biotite and silicified alteration in conjunction with deformation parallel to the Madsen unconformity. A second easterly trending brittle - ductile deformation zone, known as the Trans-Russet shear, has been identified in the target area and is parallel to the trend of 8 Zone mineralization at depth.

Historic work at the Russet South target defined five zones of gold bearing mineralization, the most important of which being the Main Zone and Zone 3. The Main Zone is characterized by pyrite, pyrrhotite and native gold associated with potassic alteration. Historic drilling in the area includes 2.2 metres grading 13.20 g/t gold from hole 35, 4.0 metres grading 14.40 g/t gold from hole UBT-88-48 and 0.8 metres grading 78.38 g/t gold from hole UBT-88-44.(1)

Zone 3 is characterized by altered volcanics, commonly silicified and mineralized by pyrite, pyrrhotite and visible gold. This zone appears to be oriented east west, parallel to the Trans-Russet shear and to the 8 Zone at depth. Historic drilling in the area includes 0.7 metres grading 63.77 g/t gold from hole 87, 13.4 metres grading 4.32 g/t gold from hole 68-14, and 1.1 metres grading 10.11 g/t gold from hole 68-8.(1)

Mineralization at Russet South has been defined by shallow drilling on the west side of Russet Lake and on the footwall side of the ultramafic contact zone. This mineralization may represent the up-dip expression of 8 Zone mineralization intersected at depth within the Madsen Mine. Pure Gold is currently conducting a focused mapping program over the Russet South target area, including a detailed soil and rock chip sampling program with the goal of drill testing the Russet South target area in the oncoming fall and winter drill program.

Geological "Footprint Modelling":

Pure Gold continues to build a deposit Footprint Model with an objective of defining structural controls and alteration vectors ("footprints") associated with gold mineralization using ultra-trace geochemistry, magnetic susceptibility, and Terraspec (ASD).

Pure Gold geologists have re-logged three historic drill holes completed by previous operators in 2008 and 2010 targeting the Apple, Fork and Starratt Zones. Concurrent with the re-logging of historic drill core and modeling, geologists are sampling mineralized zones for gold analysis as a check sampling exercise. Gold assays have been received from an additional three drill holes, with significant assay results reported below:



                Table 1 - Significant Check Assay Results(3)

----------------------------------------------------------------------------
Hole ID             From (m)      To (m)  Length (m)    Au (g/t)        Zone
----------------------------------------------------------------------------
AP-09-08              325.55      327.55         2.0        7.44       Apple
----------------------------------------------------------------------------
RUM-08-52               73.4        79.2         5.8        21.5        Fork
----------------------------------------------------------------------------
ST-10-32                 705         708         3.0       11.12    Starratt
----------------------------------------------------------------------------

ABOUT THE MADSEN GOLD PROJECT

Pure Gold recently consolidated its position in the Red Lake district with the acquisitions of the Madsen Gold property and the adjacent Newman-Madsen property (see news releases dated March 4, 2014 and June 25, 2014). Together, these properties make up a 50 square kilometre land package of contiguous, patented ground, collectively known as the Madsen Gold Project. Pure Gold now holds the third largest land package in the Red Lake region.

The property is host to two past-producing mines; existing mine infrastructure including an operational headframe, a 1,275 metre-deep shaft, and a 500 tonne per day mill; an Indicated mineral resource of 928,000 ounces gold (3.24 million tonnes grading 8.93 g/t gold) and an Inferred mineral resource of 297,000 ounces gold (0.79 million tonnes grading 11.74 g/t gold)(4); and, multiple highly prospective exploration targets in a geological setting analogous to other modern high-grade discoveries in the Red Lake district.

A new interpretation of the role of folded ultramafic contacts and structural controls have resulted in multiple recent discoveries in the Red Lake district, including Goldcorp's High Grade Zone at the Red Lake Mine Complex, the Bruce Channel system at the Cochenour Mine, and the F2 Gold System at Rubicon's Phoenix Mine. The environment and mineralization at Madsen's 8 Zone is similar to other recent high grade discoveries in the district. Recent resampling of historic drilling at the 8 Zone returned 38.26 g/t gold over 7.5 metres (see news release dated July 7, 2014). Pure Gold believes the opportunity exists to apply modern exploration science and a new understanding of the district to achieve similar success along the ultramafic contact at the Madsen Gold Project.

At Madsen, the 10 km-long ultramafic contact is highly prospective for additional high-grade discoveries, and numerous recent discoveries along this contact have only been partially advanced. Pure Gold is pursuing a strategy of exploring for additional near surface high-grade mineralization along the 12 km-long Madsen Mine trend and the 10 km-long ultramafic contact.

(1) Historic drill hole results listed in the McVeigh Ramp and Russet South target areas were completed prior to the implementation of National Instrument 43-101. A full discussion and cautionary language regarding historic sampling practices can be found in the NI 43-101 Technical Report entitled "Technical Report for the Madsen Gold Project Red Lake, Ontario, Canada," prepared by SRK Consulting (Canada) Inc. dated effective February 18, 2014.

(2) See the National Instrument 43-101 technical report entitled "Technical Report for the Madsen Gold Project Red Lake, Ontario, Canada," prepared by SRK Consulting (Canada) Inc. dated effective February 18, 2014.

(3) Assay composites were calculated using uncut assays and may include internal dilution. Composites are reported as drilled widths and interpreted to vary between 70% to 85% of true widths.

QA/QC AND CORE SAMPLING PROTOCOLS: Check samples were submitted to ALS Minerals in Thunder Bay, Ontario for sample preparation by crushing to 70% less than 2mm, rotary split off 1kg, and pulverize the split to better than 85% passing 75 microns. Sample pulps are shipped to the ALS assay laboratory in North Vancouver, B.C. for gold analysis with a 30 gram fire assay and AAS finish (code Au-AA23). Samples returning greater than 5 g/t Au are re-assayed with a gravimetric finish (code GRA21). Mineralized zones with visible gold are re-analyzed by a 1kg screen fire assay with screen to 100 microns. A duplicate 30g fire assay is conducted on the screen undersize while assaying of entire oversize fraction (code Au-SCR21). Control samples (accredited standards and blanks) were inserted on a regular basis. Results were monitored on receipt of assays by Gary Lustig, MSc, P.Geo, an independent consultant to Pure Gold and a Qualified Person as defined by National Instrument 43-101.

(4) See the National Instrument 43-101 technical report entitled "Technical Report for the Madsen Gold Project Red Lake, Ontario, Canada," prepared by SRK Consulting (Canada) Inc. dated effective February 18, 2014. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Qualified Persons

Darren O'Brien, P. Geo., Vice President, Exploration for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

ABOUT PURE GOLD

Our mandate is pure and simple. To dream big. To colour outside the lines. To use smart science and creativity to unlock the next multi-million-ounce gold discovery at the Madsen Gold Project in Red Lake, Ontario. And become Canada's next iconic gold company. Additional information about the Company and its activities may be found on the Company's website at www.puregoldmining.ca and under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

Darin Labrenz, President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain statements made and information contained in this news release and elsewhere constitutes "forward-looking information" within the meaning of Canadian securities legislation. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may constitute forward-looking statements. Such forward-looking statements are based on certain assumptions and are subject to risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements. Such factors include, but are not limited to, fluctuations in the price of gold and other commodities, continued exploration success, risks and uncertainties relating to the interpretation of drill results and the estimation of mineral resources and reserves, the geology, grade and continuity of mineral deposits, the possibility that future exploration and development results will not be consistent with the Company's expectations, changes in government legislation, taxation, controls, regulations and political or economic developments in Canada, risks associated with mining or development activities, the speculative nature of exploration and development, including the risk of obtaining necessary licenses and other risks and uncertainties including those described under Risk Factors in each management discussion and analysis and in the Company's annual information form which are available under the Company's profile at www.sedar.com. Many of these uncertainties and contingencies can affect the Company's actual performance and could cause actual performance to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Readers are cautioned that forward-looking statements are not guarantees of future performance. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those acknowledged in such statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable laws. Accordingly, readers are advised not to place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

@ThingsExpo Stories
Adobe is changing the world though digital experiences. Adobe helps customers develop and deliver high-impact experiences that differentiate brands, build loyalty, and drive revenue across every screen, including smartphones, computers, tablets and TVs. Adobe content solutions are used daily by millions of companies worldwide-from publishers and broadcasters, to enterprises, marketing agencies and household-name brands. Building on its established design leadership, Adobe enables customers not o...
Everyone knows that truly innovative companies learn as they go along, pushing boundaries in response to market changes and demands. What's more of a mystery is how to balance innovation on a fresh platform built from scratch with the legacy tech stack, product suite and customers that continue to serve as the business' foundation. In his General Session at 19th Cloud Expo, Michael Chambliss, Head of Engineering at ReadyTalk, will discuss why and how ReadyTalk diverted from healthy revenue an...
Cognitive Computing is becoming the foundation for a new generation of solutions that have the potential to transform business. Unlike traditional approaches to building solutions, a cognitive computing approach allows the data to help determine the way applications are designed. This contrasts with conventional software development that begins with defining logic based on the current way a business operates. In her session at 18th Cloud Expo, Judith S. Hurwitz, President and CEO of Hurwitz & ...
The Internet of Things will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform and how we integrate our thinking to solve complicated problems. In his session at 19th Cloud Expo, Craig Sproule, CEO of Metavine, will demonstrate how to move beyond today's coding paradigm ...
The Transparent Cloud-computing Consortium (abbreviation: T-Cloud Consortium) will conduct research activities into changes in the computing model as a result of collaboration between "device" and "cloud" and the creation of new value and markets through organic data processing High speed and high quality networks, and dramatic improvements in computer processing capabilities, have greatly changed the nature of applications and made the storing and processing of data on the network commonplace.
Digital transformation is too big and important for our future success to not understand the rules that apply to it. The first three rules for winning in this age of hyper-digital transformation are: Advantages in speed, analytics and operational tempos must be captured by implementing an optimized information logistics system (OILS) Real-time operational tempos (IT, people and business processes) must be achieved Businesses that can "analyze data and act and with speed" will dominate those t...
Almost two-thirds of companies either have or soon will have IoT as the backbone of their business in 2016. However, IoT is far more complex than most firms expected. How can you not get trapped in the pitfalls? In his session at @ThingsExpo, Tony Shan, a renowned visionary and thought leader, will introduce a holistic method of IoTification, which is the process of IoTifying the existing technology and business models to adopt and leverage IoT. He will drill down to the components in this fra...
As ridesharing competitors and enhanced services increase, notable changes are occurring in the transportation model. Despite the cost-effective means and flexibility of ridesharing, both drivers and users will need to be aware of the connected environment and how it will impact the ridesharing experience. In his session at @ThingsExpo, Timothy Evavold, Executive Director Automotive at Covisint, will discuss key challenges and solutions to powering a ride sharing and/or multimodal model in the a...
Internet of @ThingsExpo, taking place November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with the 19th International Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world and ThingsExpo Silicon Valley Call for Papers is now open.
I'm a lonely sensor. I spend all day telling the world how I'm feeling, but none of the other sensors seem to care. I want to be connected. I want to build relationships with other sensors to be more useful for my human. I want my human to understand that when my friends next door are too hot for a while, I'll soon be flaming. And when all my friends go outside without me, I may be left behind. Don't just log my data; use the relationship graph. In his session at @ThingsExpo, Ryan Boyd, Engi...
SYS-CON Events announced today that Pulzze Systems will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Pulzze Systems, Inc. provides infrastructure products for the Internet of Things to enable any connected device and system to carry out matched operations without programming. For more information, visit http://www.pulzzesystems.com.
Why do your mobile transformations need to happen today? Mobile is the strategy that enterprise transformation centers on to drive customer engagement. In his general session at @ThingsExpo, Roger Woods, Director, Mobile Product & Strategy – Adobe Marketing Cloud, covered key IoT and mobile trends that are forcing mobile transformation, key components of a solid mobile strategy and explored how brands are effectively driving mobile change throughout the enterprise.
SYS-CON Events announced today that ReadyTalk, a leading provider of online conferencing and webinar services, has been named Vendor Presentation Sponsor at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. ReadyTalk delivers audio and web conferencing services that inspire collaboration and enable the Future of Work for today’s increasingly digital and mobile workforce. By combining intuitive, innovative tec...
If you’re responsible for an application that depends on the data or functionality of various IoT endpoints – either sensors or devices – your brand reputation depends on the security, reliability, and compliance of its many integrated parts. If your application fails to deliver the expected business results, your customers and partners won't care if that failure stems from the code you developed or from a component that you integrated. What can you do to ensure that the endpoints work as expect...
WebRTC adoption has generated a wave of creative uses of communications and collaboration through websites, sales apps, customer care and business applications. As WebRTC has become more mainstream it has evolved to use cases beyond the original peer-to-peer case, which has led to a repeating requirement for interoperability with existing infrastructures. In his session at @ThingsExpo, Graham Holt, Executive Vice President of Daitan Group, will cover implementation examples that have enabled ea...
There is growing need for data-driven applications and the need for digital platforms to build these apps. In his session at 19th Cloud Expo, Muddu Sudhakar, VP and GM of Security & IoT at Splunk, will cover different PaaS solutions and Big Data platforms that are available to build applications. In addition, AI and machine learning are creating new requirements that developers need in the building of next-gen apps. The next-generation digital platforms have some of the past platform needs a...
So, you bought into the current machine learning craze and went on to collect millions/billions of records from this promising new data source. Now, what do you do with them? Too often, the abundance of data quickly turns into an abundance of problems. How do you extract that "magic essence" from your data without falling into the common pitfalls? In her session at @ThingsExpo, Natalia Ponomareva, Software Engineer at Google, provided tips on how to be successful in large scale machine learning...
In his session at @ThingsExpo, Kausik Sridharabalan, founder and CTO of Pulzze Systems, Inc., will focus on key challenges in building an Internet of Things solution infrastructure. He will shed light on efficient ways of defining interactions within IoT solutions, leading to cost and time reduction. He will also introduce ways to handle data and how one can develop IoT solutions that are lean, flexible and configurable, thus making IoT infrastructure agile and scalable.
SYS-CON Events announced today that Numerex Corp, a leading provider of managed enterprise solutions enabling the Internet of Things (IoT), will exhibit at the 19th International Cloud Expo | @ThingsExpo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Numerex Corp. (NASDAQ:NMRX) is a leading provider of managed enterprise solutions enabling the Internet of Things (IoT). The Company's solutions produce new revenue streams or create operating...
In his general session at 18th Cloud Expo, Lee Atchison, Principal Cloud Architect and Advocate at New Relic, discussed cloud as a ‘better data center’ and how it adds new capacity (faster) and improves application availability (redundancy). The cloud is a ‘Dynamic Tool for Dynamic Apps’ and resource allocation is an integral part of your application architecture, so use only the resources you need and allocate /de-allocate resources on the fly.